Project 3.18 Summary:
In order to realize a potentially transformational improvement in concrete bridge deck durability, the proposed research program intends to validate a deck design by which little to no conventional reinforcement is required. The design relies on the development of so-called arching action to maintain compressive stresses in the concrete thereby minimizing the risk of cracks that adversely affect long term durability. The project will move the technology forward by both validating the structural parameters by which the arching action is invoked, and by developing a suitable concrete mix reinforced with small non-metallic fibers that will meet the structural and long-term durability requirements. The outcome of the project will be a set of guidelines by which a field demonstration project can be developed.
Principal Investigator:
Eric Landis
Institution:
University of Maine
Co-PIs:
Dr. Bill Davids
Project Type:
Base-Funded Research
Start Date:
06/01/2022
Project Cost:
$233,781
Project Status:
In Progress
End Date:
05/31/2024
Agency ID:
69A3551847101
Sponsors:
Office of the Assistant Secretary for Research and Technology, University Transportation Centers Program, Department of Transportation, Alvin Ericson.
Implementation of Research Outcomes:
This project is in its initial research phase. Implementation of Research outcomes will be reported upon completion of initial research.
Impacts and Benefits of Implementation:
This project is in its initial research phase. Impacts and benefits of the research will be reported after the implementation phase.