Project 3.18 Summary:

In order to realize a potentially transformational improvement in concrete bridge deck durability, the proposed research program intends to validate a deck design by which little to no conventional reinforcement is required. The design relies on the development of so-called arching action to maintain compressive stresses in the concrete thereby minimizing the risk of cracks that adversely affect long term durability. The project will move the technology forward by both validating the structural parameters by which the arching action is invoked, and by developing a suitable concrete mix reinforced with small non-metallic fibers that will meet the structural and long-term durability requirements. The outcome of the project will be a set of guidelines by which a field demonstration project can be developed.


Principal Investigator:
Eric Landis

Institution:
University of Maine

Co-PIs:
Dr. Bill Davids

Project Type:
Base-Funded Research

Start Date:
06/01/2022

Project Cost:
$233,781

Project Status:
In Progress

End Date:
05/31/2024

Agency ID:
69A3551847101

Sponsors:
Office of the Assistant Secretary for Research and Technology, University Transportation Centers Program, Department of Transportation, Alvin Ericson.


Implementation of Research Outcomes:
This project is in its initial research phase. Implementation of Research outcomes will be reported upon completion of initial research.

Impacts and Benefits of Implementation:
This project is in its initial research phase. Impacts and benefits of the research will be reported after the implementation phase.